• Register
  • Login

European Journal of Molecular & Clinical Medicine

  • Home
  • Browse
    • Current Issue
    • By Issue
    • By Subject
    • Keyword Index
    • Author Index
    • Indexing Databases XML
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Publication Ethics
    • Indexing and Abstracting
    • Peer Review Process
    • News
  • Guide for Authors
  • Submit Manuscript
  • Contact Us
Advanced Search

Notice

As part of Open Journals’ initiatives, we create website for scholarly open access journals. If you are responsible for this journal and would like to know more about how to use the editorial system, please visit our website at https://ejournalplus.com or
send us an email to info@ejournalplus.com

We will contact you soon

  1. Home
  2. Volume 7, Issue 4
  3. Authors

Online ISSN: 2515-8260

Volume7, Issue4

Analysis and Development of Procured Concrete Utilizing CLP Model

    Hemant Singh Parihara Mohit Vermaa

European Journal of Molecular & Clinical Medicine, 2020, Volume 7, Issue 4, Pages 1-4

  • Show Article
  • Download
  • Cite
  • Statistics
  • Share

Abstract

The proficient planning of materials procurement & storage on construction sites might lead to important developments in project profitability &construction productivity. The current surveys concentrate on storage layout &material procurement as 2 discrete planning tasks without deliberating their mutual & difficult interdependencies. The current work reports the improvement of novel optimization method for construction logistics design, which will be able of concurrently optimizing & integrating the difficult planning decisions of material storage & procurement on construction sites. The method uses EOQ to diminish construction logistics prices, which cover stock-out, material ordering, financing, and prices of layout. The method includes newly established procedures to assessment influence of probable material shortages on-site due to late delivery on stock-out costs &project delays.
Keywords:
    construction logistic cost storage area planning price breaks planned shortages. 1
  • PDF (348 K)
  • XML
(2020). Analysis and Development of Procured Concrete Utilizing CLP Model. European Journal of Molecular & Clinical Medicine, 7(4), 1-4.
Hemant Singh Parihara; Mohit Vermaa. "Analysis and Development of Procured Concrete Utilizing CLP Model". European Journal of Molecular & Clinical Medicine, 7, 4, 2020, 1-4.
(2020). 'Analysis and Development of Procured Concrete Utilizing CLP Model', European Journal of Molecular & Clinical Medicine, 7(4), pp. 1-4.
Analysis and Development of Procured Concrete Utilizing CLP Model. European Journal of Molecular & Clinical Medicine, 2020; 7(4): 1-4.
  • RIS
  • EndNote
  • BibTeX
  • APA
  • MLA
  • Harvard
  • Vancouver
  • Article View: 248
  • PDF Download: 301
  • LinkedIn
  • Twitter
  • Facebook
  • Google
  • Telegram
Journal Information

Publisher:

Email:  editor.ejmcm21@gmail.com

  • Home
  • Glossary
  • News
  • Aims and Scope
  • Privacy Policy
  • Sitemap

 

For Special Issue Proposal : editor.ejmcm21@gmail.com

This journal is licensed under a Creative Commons Attribution 4.0 International (CC-BY 4.0)

Powered by eJournalPlus