Volume 11 (2024) | Issue 5
Volume 11 (2024) | Issue 5
Volume 11 (2024) | Issue 5
Volume 11 (2024) | Issue 5
Volume 11 (2024) | Issue 4
An estimate ideal for methane manufacture in a wastewater indulgence facility is accessible. The ideal is assembled by data-mining procedures balanced on business statistics composed on a day-to-day source. From the time when numerous factors accessible in this study, a subsection of bounds is nominated by means of significance scrutiny. Likelihood fallouts of methane creation are available in this paper. The prototypical show through altered procedures is restrained with well-organized metrics. Grounded going on these metrics, the ideal fabricated through the Adaptive Neuro-Fuzzy Inference System process has conveyed maximum clear-cut assessments of methane fabrication.